Long awaited Hatirjheel-Begunbari project opened

0 minutes, 46 seconds Read

DN-hatirjheelPrime Minister Sheikh Hasina has formally inaugurated Hatirjheel-Begunbari integrated project yesterday. This project was initiated by the military backed interim government.

It was an integrated project to connect east and west portion of the country. Hatirjheel Lake is connected to Gulshan Lake to improve drainage system. Service road, walkway, footpath, bridges on the lake and overpasses are built as part of the project. It will also be a recreation spot for city dwellers.

Residents of Rampura, Badda, Ulan, Modhubagh, Moghbazar, Gulshan, and Tejgaon will be able to move easily now. Experts are hoping that this project will ease the traffic congestion in the capital.

Some part of the project work is yet to be completed. Construction of theater, park, garden and U loop at Rampura end is not finished yet.

Illegal BGMEA building which is blocking drainage at Karwan Bazar end is not demolished yet.

Dhaka WASA, Rajuk and Bangladesh army jointly implemented the project.

2104 Total Views 1 Views Today
Spread the love
author

Shihab Uddin Ahmed

Shihab Uddin Ahmed is with Dhaka News since 2011. He has long experience of writing on various issues for web medium. He has a master’s degree from Jagannath University. You can read his science articles in English and Bengali on https://fromreadingtable.com

Similar Posts