Singapore’s Sembcorp Green Infra Limited has proposed to supply 50 MW of power to Bangladesh through the existing Baharampur-Bheramara Indo-Bangla grid interconnectivity. The electricity tariff will be $7.35 per unit, which includes transmission charges and 0.48 cents of losses. This indicates that the proposed price is costlier than the existing power import prices under public…